Business Type

drying oven,kiln oven,furnace,and heat system machine such as conveyer or rotary oven for industry as well as supply oven equipment, 50-600 ํc roller system furnace, 300 ํc drying conveyor system with plc control, 40-200 ํc rotary system dryer machine, 100-200 ํc electric furnace, 1260 ํc kiln oven, 3 level

., used to level the floor in the factory. leveling the road to be evenly smooth, thin from 2 mm.-10 mm. with a compressive strength of 450ksc.

chili sauce is full of quality. it can be eaten by both children and adults. suitable for all kinds of food such as fried mussels and omelettes, or used to dip fried food, grilled food. moreover, it can also be used to marinate. helps to add flavor to your favorite dishes perfectly with restaurant-level

reinforced concrete foundation building home improvement solution wall crack that does not affect the building itself and the side. like pile pile with micro needle. short pile with thick pile head, thick steel, can connect micro pile of short to long depth in the soil layer to the depth of needle in the level

contractor for making concrete floors with high level standards. supports various types of work airport concrete floor concrete floor for container yard concrete floor for large gas stations

clear the soil surface to make it level. or dig a trench to grow crops, grow vegetables, or grow fruit trees.

we also offer a variety of roller shutter styles to choose from, including: solid: solid roller shutters are made from a single sheet of metal, and they provide the highest level of security.

global standards for electronic product testing by sti sti environmental reliability laboratory is a globally recognized company from china, with over 50 years of high-level expertise in product testing services to assess quality, reliability, and certification that is accepted in the international

, mosquito nets, chiang mai install sash windows louvers, bare doors, fixed windows, mosquito nets mosquito net window mosquito net door installation of safety railing, tempered glass railing tempered glass balcony railing, chiang mai installation of smooth plastered ceilings, t-bar ceilings, level

installation 1. adjust the roof level of the building where the floor slab will be placed so that it is smooth and level. before laying the floor, the beams that will be supported should be cleaned. keep the weight of the floor free of soil or plaster fragments. in order to place the floor closely